Final report LesystT IPT C2I 2005
Publish date: 2006-01-01
Report number: FOI-R--1961--SE
Pages: 17
Written in: Swedish
Abstract
Within project LedsystT a number of Integrated Project Teams (IPTs) exist. The objective of the IPTs is to transfer for LedsystT usable knowledge from FOI to FMV. This report summarizes the work that has been done in LedsystT IPT C2I during 2005. The work has been performed in two different forms, as Work Packages (WPs) and as direct expert support to the industry group working with LedsystT. During 2005 the IPT has worked with three work packages, i.e. WP Information divided into Information interoperability and Ontological interoperability, WP Data fusion divided into Negative information and HLA adaptation of models for ground target surveillance and WP Tactical mapping working with Geodata package for study and demonstration purposes. In addition to summarizing the work done during 2005, the report also contains references to more detailed reports from the different work packages and direct expert supports.